211 Lees Avenue (Hayley Court)

Featured Image

Share this story

  • Email
  • Copy Link
  • Facebook
  • Twitter-X
  • LinkedIn
  • LinkedIn

[cmsms_row data_width=”boxed” data_padding_left=”3″ data_padding_right=”3″ data_color=”default” data_bg_color=”#ffffff” data_bg_position=”top center” data_bg_repeat=”no-repeat” data_bg_attachment=”scroll” data_bg_size=”cover” data_bg_parallax_ratio=”0.5″ data_color_overlay=”#000000″ data_overlay_opacity=”50″ data_padding_top=”0″ data_padding_bottom=”50″][cmsms_column data_width=”1/2″][cmsms_image align=”center” caption=”Before” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/IMG_5677.jpg” animation_delay=”0″]5548|https://www.och-lco.ca/wp-content/uploads/2016/01/IMG_5677-580×390.jpg|blog-masonry-thumb[/cmsms_image][cmsms_image align=”center” caption=”After” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/Lees-Avenue1.jpg” animation_delay=”0″]5547|https://www.och-lco.ca/wp-content/uploads/2016/01/Lees-Avenue1-580×390.jpg|blog-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/2″][cmsms_text animation_delay=”0″]

Project

The project involves the construction of 16 new homes, including 2 four-bedroom modified accessible stacked townhouses. It includes a mix of one, two, three and four-bedroom homes. This new development is constructed on the foundations of an existing fire damaged structure that used to house 14 homes. This redesign adds 2 additional homes with a total of 10 additional bedrooms and a split level style concept with south / north frontage that maximizes sunlight and cross ventilation for increased tenant comfort. Two of the 3-bedroom townhouse layouts can be easily modified to increase the bedroom count by one (to a 4-bedroom) to accommodate the needs of a larger family. The homes are built to be highly energy efficient, using LED lighting and polished concrete radiant floor heating.

Status: Completed

Investment

The new build is expected to cost approximately $4.5M.

Completion Date
January 2016

Community Profile

  • 16 Stacked Townhouses:
  • 1 one-bedroom – visitable
  • 4 two-bedroom with den
  • 6 two-bedroom
  • 1 three-bedroom – visitable
  • 2 three-bedroom with den
  • 2 four-bedroom – modified accessible

[/cmsms_text][/cmsms_column][/cmsms_row][cmsms_row data_width=”boxed” data_padding_left=”3″ data_padding_right=”3″ data_color=”default” data_bg_color=”#ffffff” data_bg_position=”top center” data_bg_repeat=”no-repeat” data_bg_attachment=”scroll” data_bg_size=”cover” data_bg_parallax_ratio=”0.5″ data_color_overlay=”#000000″ data_overlay_opacity=”50″ data_padding_top=”0″ data_padding_bottom=”50″][cmsms_column data_width=”1/1″][cmsms_heading type=”h2″ font_weight=”400″ font_style=”normal” text_align=”left” target=”self” margin_top=”0″ margin_bottom=”20″ animation_delay=”0″]From the official opening…[/cmsms_heading][/cmsms_column][/cmsms_row][cmsms_row data_width=”boxed” data_padding_left=”3″ data_padding_right=”3″ data_color=”default” data_bg_color=”#ffffff” data_bg_position=”top center” data_bg_repeat=”no-repeat” data_bg_attachment=”scroll” data_bg_size=”cover” data_bg_parallax_ratio=”0.5″ data_color_overlay=”#000000″ data_overlay_opacity=”50″ data_padding_top=”0″ data_padding_bottom=”50″][cmsms_column data_width=”1/3″][cmsms_image align=”center” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/Lees3.jpg” animation_delay=”0″]5576|https://www.och-lco.ca/wp-content/uploads/2016/01/Lees3-580×390.jpg|blog-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/3″][cmsms_image align=”center” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/Lees2.jpg” animation_delay=”0″]5575|https://www.och-lco.ca/wp-content/uploads/2016/01/Lees2-580×390.jpg|blog-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/3″][cmsms_image align=”center” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/Lees.jpg” animation_delay=”0″]5573|https://www.och-lco.ca/wp-content/uploads/2016/01/Lees-580×390.jpg|blog-masonry-thumb[/cmsms_image][/cmsms_column][/cmsms_row][cmsms_row data_padding_bottom=”50″ data_padding_top=”0″ data_overlay_opacity=”50″ data_color_overlay=”#000000″ data_bg_parallax_ratio=”0.5″ data_bg_size=”cover” data_bg_attachment=”scroll” data_bg_repeat=”no-repeat” data_bg_position=”top center” data_bg_color=”#ffffff” data_color=”default” data_padding_right=”3″ data_padding_left=”3″ data_width=”boxed”][cmsms_column data_width=”1/3″][cmsms_image align=”none” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0082.jpg” animation_delay=”0″]5599|https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0082-580×386.jpg|project-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/3″][cmsms_image align=”none” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0083.jpg” animation_delay=”0″]5600|https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0083-580×386.jpg|project-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/3″][cmsms_image align=”none” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0084.jpg” animation_delay=”0″]5602|https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0084-580×386.jpg|project-masonry-thumb[/cmsms_image][/cmsms_column][/cmsms_row][cmsms_row data_padding_bottom=”50″ data_padding_top=”0″ data_overlay_opacity=”50″ data_color_overlay=”#000000″ data_bg_parallax_ratio=”0.5″ data_bg_size=”cover” data_bg_attachment=”scroll” data_bg_repeat=”no-repeat” data_bg_position=”top center” data_bg_color=”#ffffff” data_color=”default” data_padding_right=”3″ data_padding_left=”3″ data_width=”boxed”][cmsms_column data_width=”1/3″][cmsms_image align=”none” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0081.jpg” animation_delay=”0″]5601|https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0081-580×386.jpg|project-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/3″][cmsms_image align=”none” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0099.jpg” animation_delay=”0″]5603|https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0099-580×386.jpg|project-masonry-thumb[/cmsms_image][/cmsms_column][cmsms_column data_width=”1/3″][cmsms_image align=”none” link=”https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0101.jpg” animation_delay=”0″]5604|https://www.och-lco.ca/wp-content/uploads/2016/01/DSC_0101-580×386.jpg|project-masonry-thumb[/cmsms_image][/cmsms_column][/cmsms_row]