MOSAÏQ OTTAWA – phase 2

Gladstone, Rochester
and Booth, Ottawa

Background

The phase 2 redevelopment at 820 Gladstone will cover the northern 2.7 acres of a block bounded by Gladstone, Rochester, Booth and Raymond.  It will include mid-rise residential development along Gladstone and Rochester with low-rise townhomes along Booth.

Community Benefits 

The development will include a series of non-residential spaces that will be used for commercial rentals, community services and a number of work/live units. The site will also include multiple car-share parking spaces available for use by tenants and the broader community.

Sustainability 

  • Passive house design to minimize ongoing heating/cooling energy costs  
  • Zero carbon footprint 
  • Wastewater heat recovery 
  • Solar photovoltaic array on the building rooftops 
  • The design incorporates best practice design for seniors/accessible/visitable/barrier-free housing 

Amenities & Features  

There will be 273 new homes within five (5) buildings.  The proposed design is for two (2) nine-storey buildings with 240 homes, with another 32 homes within three (3) townhouse blocks. 

The design will support affordable housing with studios, one-bed homes, two-three, and four-beds.  It will include a generous amount of indoor and outdoor amenity space, coupled with surface and underground parking, bicycle parking, storage lockers, and a central park. 

Located at 820 Gladstone Avenue, it will be a 9-story building with 155 homes fronting  Gladstone Avenue and some 4,000 ft2 of commercial space at grade. 

Located at 305 Rochester Street, it will be a 9-storey building with 86 homes fronting on Rochester Street.  This building will be a partnership with PAL Ottawa. 

Other Features Include 

  • Fitness room 
  • Lounge and social rooms 
  • Study rooms 
  • Central outdoor park with play area

Status

Construction work is underway.

Expected Completion Date

2026 

Investment

This multi-million dollar development is possible because of the contribution of the following investors: 
Ottawa Community Housing, Canada Mortgage and Housing Corporation and the City of Ottawa. 

Important Milestones

  • Site Plan Application:  December 2021
  • Information Session:  December 13, 2021
  • Building Permit Approval:  August 2023
  • Groundbreaking Event, the introduction of the general contractor (HEIN) and Architect Firm (Hobin): October 2023

Oct 16th, 2023 NEWS RELEASE: Shovels are in the ground!